| Meeting Date | Meeting Number | Link to the Minutes and Action List (EDMS) |
| 23 November 2023 | tentative | |
| 21 September 2023 | tentative | |
| 22 June 2023 | tentative | |
| 27 April 2023 | tentative | |
| 19 January 2023 | 53 | Seismic Risk Assessment of Shielding Block Configurations; Change of access to PMI2; Update on LHC P4 recommendations; Update on TIM operation from the CCC by TI/OP; |
| 10 November 2022 | 52 | Helium venting in P4: Return of experience from August incident and recommendations; Status of updates to drawings for LHC access and patrols (Action #3); Status of proposed suppression of RIAs (Action #16) |
| 23 June 2022 | 51 | Firefighting assessment for TI2 and TI8; Follow-up from TIM Review; Access to metallic stairs during technical stops; Update of the LHC patrol documents; Run 3 Days Safety point; |
| 19 May 2022 | Workshop | LHC CSAP Workshop: TIM experience during LS2 |
| 20 January 2022 | 50 | Overpresure in Experiments and UPR; New layout for access in Point 4; Major event exercise 2021-Point 5 CMS- feedback |
| 7 October 2021 | 49 | Presence of personnel during x-Ray imaging at LHCb; Feedback BLM TIM test; UPR temporary ventilation until LS3 |
| 3 June 2021 | 48 | FIRIA Project; LIGHT installation modifications; Update Safety File LHC RUN3; LASS global tests 4.6.2021 |
| 15 April 2021 | 47 | Phase 2 powering constraints and shutdown; Access to the LHC RF area, Maintenance of the LHC fire hydrants |
| 24 September 2020 | 46 | Radio-protection analysis of the UPRs; LHC Safety test planning towards beam; LASS test scheduling |
| 25 June 2020 | 45 | Air activation estimates for the triplets and the caverns; Progress on PMI2; Update of LHC Safety documents; New test schedule for LHC access system |
| 30 January 2020 | 44 | LHC access system site tests (P4); SPS fire Safety; Update of LHC Safety documents |
| 3 October 2019 | 43 | Preparation for commissioning and operation in Run 3; LASS test after LS2; FASER experiments safety aspects; Emergency lighting interface proposal; Conclusion of the fire detection system audit |
| 22 November 2018 | 42 | PMI2 follow up; Over-pressure in the experiments; New workflow for the detection request; UPR connections during LS2-Safety; LHC Crab cavity – new EIS-machine for Run4 |