LHC-CSAP Minutes and Action List

Meeting DateMeeting NumberLink to the Minutes and Action List (EDMS)
Meeting DateMeeting NumberLink to the Minutes and Action List (EDMS)
23 November 2023tentative
21 September 2023tentative
22 June 2023tentative
27 April 2023tentative
19 January 202353Seismic Risk Assessment of Shielding Block Configurations; Change of access to PMI2; Update on LHC P4 recommendations; Update on TIM operation from the CCC by TI/OP;
10 November 202252Helium venting in P4: Return of experience from August incident and recommendations; Status of updates to drawings for LHC access and patrols (Action #3); Status of proposed suppression of RIAs (Action #16)
23 June 202251Firefighting assessment for TI2 and TI8; Follow-up from TIM Review; Access to metallic stairs during technical stops; Update of the LHC patrol documents; Run 3 Days Safety point;
19 May 2022WorkshopLHC CSAP Workshop: TIM experience during LS2
20 January 202250Overpresure in Experiments and UPR; New layout for access in Point 4; Major event exercise 2021-Point 5 CMS- feedback
7 October 202149Presence of personnel during x-Ray imaging at LHCb; Feedback BLM TIM test; UPR temporary ventilation until LS3
3 June 202148FIRIA Project; LIGHT installation modifications; Update Safety File LHC RUN3; LASS global tests 4.6.2021
15 April 202147Phase 2 powering constraints and shutdown; Access to the LHC RF area, Maintenance of the LHC fire hydrants
24 September 202046Radio-protection analysis of the UPRs; LHC Safety test planning towards beam; LASS test scheduling
25 June 202045Air activation estimates for the triplets and the caverns; Progress on PMI2; Update of LHC Safety documents; New test schedule for LHC access system
30 January 202044 LHC access system site tests (P4); SPS fire Safety; Update of LHC Safety documents
3 October 201943Preparation for commissioning and operation in Run 3; LASS test after LS2; FASER experiments safety aspects; Emergency lighting interface proposal; Conclusion of the fire detection system audit
22 November 201842PMI2 follow up; Over-pressure in the experiments; New workflow for the detection request; UPR connections during LS2-Safety; LHC Crab cavity – new EIS-machine for Run4